2 on 2
Space: 119m²
Capacity: 20 people
Office provision: 6 people
Ideal for small construction sites, this compound can be fully deployed within just four weeks.
Our dedicated drying room ensures work clothes are dry and ready for the day ahead. Additionally, our toilets and canteens ensure CDM compliance, and with the option to include distribution boards and sanitary products, we prioritise improving welfare standards on site.
The office space is perfectly suited for site managers and their teams, offering a choice between anti-vandal shutters or UPVC windows with integrated roller shutters. To further enhance comfort and connectivity, we provide a range of customisable options to suit your needs.
For seamless installation, we supply all necessary ancillary products, including twist locks, links, and staircases, ensuring a rapid and efficient setup.
Newspace offers customisation of colours, thermal specifications, and finishes to meet your exact requirements. Additionally, you can comply with confidence by opting for our JCoP 10.1 upgrade, which provides 30 minutes of fire resistance (REI).
Looking to reduce heating costs? Ask us about our EPC A-rated insulation system, which can lower heating expenses by up to 55%.
2 on 2
Space: 119m²
Capacity: 20 people
Office provision: 6 people
Ideal for small construction sites, this compound can be fully deployed within just four weeks.
Our dedicated drying room ensures work clothes are dry and ready for the day ahead. Additionally, our toilets and canteens ensure CDM compliance, and with the option to include distribution boards and sanitary products, we prioritise improving welfare standards on site.
The office space is perfectly suited for site managers and their teams, offering a choice between anti-vandal shutters or UPVC windows with integrated roller shutters. To further enhance comfort and connectivity, we provide a range of customisable options to suit your needs.
For seamless installation, we supply all necessary ancillary products, including twist locks, links, and staircases, ensuring a rapid and efficient setup.
Newspace offers customisation of colours, thermal specifications, and finishes to meet your exact requirements. Additionally, you can comply with confidence by opting for our JCoP 10.1 upgrade, which provides 30 minutes of fire resistance (REI).
Looking to reduce heating costs? Ask us about our EPC A-rated insulation system, which can lower heating expenses by up to 55%.